Hotel Furniture

Hotel Furniture

The hotel furniture in this group reflects the work we do for upscale properties, where the furniture has to follow the interior architect’s drawings closely. Guest rooms, suites, lobbies and restaurants are produced from shop drawings that we prepare and agree with the design team. Veneers, lacquer colours and metal or leather accents are submitted as samples, and a mock-up room is usually built before series production.

All products

186 products

Furniture, wall panelling and doors can be made in our Istanbul workshop to one standard of detail. Send us your drawings to discuss samples.

Frequently Asked Questions

How many years does hotel furniture last?

Hotel furniture made with quality materials and professional production can be used without problems for an average of 10-20 years. Intensity of use and maintenance conditions can affect this period.

Are fire-rated hotel doors mandatory?

In many hotel projects, the use of fire-rated doors is mandatory under fire regulations. These doors are of great importance for safe evacuation in the event of a fire.

How long does hotel furniture production take?

Depending on the size of the project, hotel furniture production time usually ranges from 30 to 90 days.

Can custom-designed hotel furniture be made?

Yes. Furniture designed specifically for hotel projects can be produced in line with the architectural project. This results in original designs that are in harmony with the hotel's concept.

Request a quote for your project

Step 1 of 2

Project details
Contact details