Customer Scenario: Fitting Out a 120-Room City Hotel with Beds, Wardrobes and Desks in Three Deliveries
A narrative walk-through of how a 120-room city hotel could split its guest room furniture into three delivery waves, timed to floor handovers and snagging. Use it as a planning model for your own project.
This hotel furniture project case study follows a representative scenario: a 120-room city hotel that receives its beds, wardrobes and desks in three separate deliveries. It is a composite planning example, not a named client, and the room counts are chosen for illustration. Real schedules depend on your building programme, materials and shipping route, but the logic of sequencing applies to most mid-sized hotels.
The brief: 120 rooms, one building site, one opening date
Imagine a new city hotel with six guest floors and 20 rooms per floor. The owner wants a consistent look across all rooms, and the contractor hands over the building floor by floor rather than all at once. The furniture package covers beds and headboards, wardrobes, desks with chairs, bedside tables and luggage benches, all made to the designer's drawings.
The central question is simple: should everything arrive in one container wave, or should deliveries follow the building? In this scenario the team chose three waves, because storing 120 rooms of furniture on a live construction site carries more risk than a staged flow.
Why three deliveries instead of one
A single delivery looks efficient on paper, but it puts the whole package on site before most rooms are ready. Dust, damp, other trades and limited storage space all threaten finished joinery. Staged furniture delivery keeps pieces in their packaging for a shorter time and lets the installation team work in clean, finished rooms.
The trade-off is more coordination. Each wave needs its own packing list, shipping booking, customs paperwork and installation window. The team accepted that cost because it reduced the chance of damage and storage disputes.
The wave plan at a glance
| Wave | Rooms | Purpose | Key condition before shipping |
|---|---|---|---|
| Wave 1 | Floors 1-2 (40 rooms) | Pilot floors, sales photography, operator training | Mock-up room approved, finishes signed off |
| Wave 2 | Floors 3-4 (40 rooms) | Main production run, lessons from wave 1 applied | Wave 1 snagging list closed or agreed |
| Wave 3 | Floors 5-6 (40 rooms) | Remaining rooms, suites and spare stock | Floors handed over, lifts and corridors free |
The split is illustrative. Another hotel might use two waves or four, depending on how the contractor releases floors and how much storage is available.
Before wave one: drawings, mock-up and sign-off
No delivery wave should leave the factory before the design is frozen. In this scenario the team first approved shop drawings, then built one mock-up guest room. The owner, operator and designer reviewed proportions, socket positions, wardrobe interiors, finish colours and hardware feel in a single meeting.
Changes made at the mock-up stage were small and cheap: a shelf height adjusted, a drawer handle changed, a bedside socket moved. Once the sample was signed off, the approved drawings became the reference for all three waves. That matters because production batches for later floors should match the first ones as closely as possible.
Wave one: two pilot floors
The first delivery covered the two floors handed over earliest. Furniture was packed room by room, with each carton labelled by floor, room number and item. The installation crew worked through one room at a time, from levelling wardrobe carcasses to final door alignment.
These pilot rooms did a lot more than fill space. They gave the hotel's sales team real rooms to photograph, the housekeeping lead a chance to test cleaning access, and the engineers a first look at how the furniture met walls and floors. In the scenario, a few small points appeared: slight door reveal differences and one desk that sat tight against a skirting board. Because only 40 rooms were affected, the fixes were quick.
The snagging loop between waves
Snagging is where staged delivery earns its value. After wave one, the contractor, designer and installer walked each room with a shared checklist and recorded every defect with a photo and room number. The factory received this list before wave two was finalised.
A typical loop looks like this:
- Walk the rooms and record each item with a photo and location.
- Sort findings into site issues (wall or floor tolerances) and factory issues (finish or fit).
- Agree corrections and decide whether they apply to waves two and three in production.
- Close out repairs before the next delivery arrives, so crews are not fixing and installing at the same time.
Separating site issues from factory issues avoids arguments later. An uneven wall is a trade-coordination matter; a chipped edge is a production or transport matter. Knowing which is which saves weeks of discussion.
Wave two: the main production run
With the first floors approved, wave two carried the bulk of the work. Production changes found during snagging, such as a slightly adjusted plinth detail, went into the remaining batches. Packing was refined too: extra corner protection went on headboards after the team noticed minor scuffs on arrival in wave one.
Timing was coordinated with the contractor's programme. The delivery was scheduled so that lifts and corridors were free of other deliveries, and the installers could start as soon as the rooms were swept and painted. This is the heart of a good hotel opening furniture timeline: arrival dates follow room readiness, not the other way around.
Wave three: remaining floors, suites and spares
The last wave covered the top floors and any larger rooms with extra pieces. It also included a small stock of spare parts, such as a few doors, drawer fronts and bedside tables, produced in the same batch for colour consistency. Ordering spares with the main run is usually easier than matching finishes years later.
By this stage the process was routine. Crews knew the room layout, the packing labels were familiar and the snagging list was short. The final walk-through focused on cosmetic touch-ups and cleaning before handover to the operator.
What this scenario teaches about a 120 room hotel fit-out
- Link deliveries to floor handovers. Ask the contractor for a realistic floor-by-floor release schedule before fixing shipping dates.
- Use early floors as a test. Treat wave one as a learning step, not just the first shipment.
- Keep one approved reference. The mock-up room and signed drawings protect consistency across waves.
- Plan the snagging time. Leave a gap between waves for inspection and corrections.
- Label everything. Room-by-room packing prevents mix-ups on site.
- Check the logistics. Shipping terms, customs paperwork and site access should be confirmed for each wave, wherever your hotel is located.
None of these points depends on a specific country. Palmiye supplies hotel projects worldwide from our factory in Istanbul, and staged delivery works whether furniture travels by truck, sea freight or a mix of both.
What can change the plan
Timing and cost are not fixed numbers in any case study. Several factors shift them:
- Materials and finishes, especially lacquer, veneer or imported fabrics.
- The size of each wave and the number of different room types.
- Approval speed on drawings and samples.
- Destination, shipping terms such as FOB or DAP, and customs procedures.
- Site conditions, including lift size, storage space and installation access.
For that reason, we prefer to review your drawings and construction programme before suggesting a wave structure.
Next step
If you are planning a new hotel or a floor-by-floor renovation, send us your room schedule, drawings and target opening date. We will review the package and suggest a delivery sequence, material options and shipping routes that fit your programme.
Sıkça Sorulan Sorular
Is it better to deliver hotel furniture in one shipment or several?
It depends on how the building is handed over. If all rooms are ready at once and storage is secure, one shipment can work. If floors are released gradually, staged delivery reduces storage risk, protects finished pieces and lets you fix snagging issues between waves.
How many delivery waves should a 120-room hotel plan?
There is no fixed number. Three waves of roughly equal size is a common logic, but the right split follows your floor handover dates, site storage and installation crew capacity. We suggest reviewing the construction programme first, then setting the waves.
Why build a mock-up room before the first wave?
A mock-up lets the owner, operator and designer approve proportions, finishes, hardware and socket positions in a real room. Changes at this point are inexpensive, and the signed-off sample becomes the reference for every later production batch.
How do you keep finishes consistent across three deliveries?
Work from one approved sample and signed drawings, and ask the factory to record finish and board batch details. Ordering spare parts in the main production run also helps, because later reorders may not match the original batch exactly.
Can you supply hotel furniture to projects outside Turkey?
Yes. Palmiye produces to project drawings in our Istanbul factory and supplies hotels worldwide. Shipping terms, packing and installation support are agreed per project, so please send your drawings and destination for a tailored proposal.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.