Hotel Bedroom Furniture Drawing Package Checklist for Fit-Out Contractors: Plans, Elevations and Fixing Details

Most installation problems start on paper, not on site. Use this checklist to confirm that your drawing package answers every fixing, access and coordination question before production begins.

A complete furniture drawing package checklist helps you find installation problems while they are still lines on a sheet. For a fit-out contractor, the goal is simple: every question your crew would ask on site should already be answered in the drawings before the factory cuts a single board. This guide lists what to check, sheet by sheet, so that approval means something.

The checklist below applies to bedroom furniture packages such as beds, headboards, wardrobes, desks and bedside units. It works whether the drawings come from the designer, from the factory, or from both. Palmiye produces to approved project drawings and supplies to hotel projects worldwide, so the points here reflect what makes an order smooth from Istanbul to any destination.

Why the drawing package matters more to contractors than to designers

A designer reviews drawings for appearance and proportion. A contractor reviews them for buildability: can it get through the door, fix to the wall, line up with the services and be adjusted on the day? These are different questions, and they are rarely answered by a render.

Reviewing joinery shop drawings as an installer, rather than as an approver of the design, catches issues that otherwise surface as site delays or remedial work. It also gives you a documented basis if something later needs to be changed.

Part 1: Plans

Plans show where each piece sits in the room and how it relates to the building. Check the following:

  • Room type and number reference: each sheet states which room types and which room numbers it covers.
  • Dimensioned layout: overall sizes of every item, with distances to walls, windows, doors and bathroom entrances.
  • Finished floor and wall conditions: flooring thickness, skirting height, wall lining and any planned panelling that changes the available space.
  • Door swings and clearances: room door, bathroom door and wardrobe door arcs, shown so that nothing collides.
  • Orientation and handing: left- and right-hand versions are marked, especially for mirrored room layouts.
  • Service positions: sockets, data points, switches, air-conditioning units, sprinklers and detectors shown against the furniture.

Where the building is irregular, ask for a note stating who confirms site dimensions and when. A short survey before production is far cheaper than a refit afterwards.

Part 2: Elevations

Elevations show the face of each unit and are where most finish and detail decisions are recorded.

  • Overall and internal dimensions in millimetres, with imperial equivalents if the project requires them.
  • Door and drawer layout: number of fronts, gaps between them and the reveal lines at the ceiling, floor and walls.
  • Finish call-outs: each visible surface linked to a material code on the finish schedule, including grain direction for veneer.
  • Handles and pulls: type, position and projection, so you can check for snag risks and clearances.
  • Mirrors, lighting and inserts: positions and sizes, including any cut-outs.
  • Fillers and return panels: where units meet walls, the drawing shows how the gap is closed and whether the filler is scribed on site.

Part 3: Sections and construction details

Sections answer how the piece is actually made and what it is made of. They are the most useful sheets for contractor drawing review, yet the ones most often missing from a thin package.

What a good section shows

  • Board type and thickness for carcasses, shelves, backs and doors.
  • Edge treatment on exposed and concealed edges.
  • Plinth or leg construction, and how height is adjusted.
  • Back panel fixing and how it is protected from cleaning water.
  • Hardware: hinge type and count, drawer runner type, shelf support and any soft-close components.
  • Cable routes through units, with grommet or cut-out positions.

Questions to ask

Can a drawer be removed for service? Can a door be adjusted in three directions after installation? Is there access to the concealed fixings after the unit is in place? If the section does not answer these, ask for it to be added.

Part 4: Fixing details

This is the part that matters most to your crew. Fixing details hotel furniture drawings should be specific enough that an installer does not have to guess.

ItemWhat the drawing should state
Wall-hung unitsCleat or bracket type, fixing centres, wall substrate assumed, load notes
Tall wardrobesAnti-tip fixing method and position, fixing to wall or ceiling frame
HeadboardsWall-hung, bed-attached or floor-standing, with fixing positions and height above floor
Bed framesAssembly joints, connection between base and headboard, mattress size and recess
Desks and consolesSupport method, leg or wall bracket, cable access
Panels and fillersFixing to carcass or wall, scribe allowance, hidden or visible screws

Also confirm the wall type. Fixings that suit solid masonry may be unsuitable for plasterboard or lightweight partitions, so the drawing should say where blocking or reinforcement is needed and who provides it.

Part 5: Schedules and supporting sheets

Beyond the drawings themselves, a complete package normally includes:

  1. Finish schedule: every material, colour and sheen with a reference code.
  2. Hardware schedule: hinges, runners, handles, locks and any electrical components.
  3. Quantity schedule: items per room type and total counts, so packing and delivery can be planned.
  4. Room data sheets: a one-page summary per room type, linking drawings, finishes and quantities.
  5. Revision log: dates, change descriptions and who approved them.

A revision log is easy to overlook, but it is what stops the factory and the site working from different versions.

Part 6: Coordination checks with other trades

Furniture is installed in a room that other trades have already touched, or are still touching. Before approving, cross-check the drawings against:

  • Electrical and lighting layouts, including bedside switches and wardrobe lighting feeds.
  • HVAC positions, so grilles and units do not clash with tall joinery.
  • Flooring levels and finishes, including any raised areas or thresholds.
  • Wall finishes and panelling that may add thickness behind furniture.
  • Ceiling heights and bulkheads above wardrobes.

Mark clashes on the drawing and send them back as a single list. One consolidated comment sheet is easier for everyone than scattered emails.

Part 7: Delivery and handling information

Good drawings also tell you how the pieces will arrive. Ask whether items are supplied flat-packed, in sub-assemblies or pre-assembled, and check the largest component against lift and corridor dimensions. Room-by-room labelling on packages should be defined in the package so that the delivery sequence matches your installation programme.

If the project has strict access, such as a narrow staircase or a small service lift, say so before approval. It can change how large panels are split.

A quick contractor sign-off list

  • Every room type has a plan, elevations and at least one section.
  • Dimensions agree with a site survey or a stated survey date.
  • Fixing method and wall substrate are stated for every wall-fixed item.
  • Services positions are shown and coordinated.
  • Finish, hardware and quantity schedules match the drawings.
  • Gaps, fillers and scribing allowances are defined.
  • Door swings and clearances are checked.
  • Revision log is current and the approved version is clearly marked.

Making approval count

Approval should mean you have checked buildability, not simply that you have seen the drawing. If a mock-up room is part of the programme, use it to test the fixing and tolerance assumptions on the drawings, then update the package before mass production. Late changes after production starts are the most expensive kind, so it pays to be thorough while changes are still only edits on a sheet.

Next step

If you are preparing a hotel fit-out and want a second pair of eyes on your drawings, send us your plans, elevations or room schedule. We will review the package, point out fixing, access and coordination questions, and advise on production and export options to your destination.

Sıkça Sorulan Sorular

What should a furniture drawing package include for a hotel project?

A complete package normally includes plans, elevations, sections, fixing details, finish and hardware schedules, quantity schedules, room data sheets and a revision log. Together they let the factory produce and the contractor install without relying on assumptions or verbal instructions.

Who is responsible for checking site dimensions before production?

This should be agreed in writing before approval. Often the contractor surveys the rooms and confirms dimensions, while the factory works to those figures. The drawings should state who confirms measurements and when, so responsibility is clear if the building differs from the plans.

Why are fixing details so important in shop drawings?

Fixing details tell installers how each item attaches to walls, floors or other units, and what wall type is assumed. Without them, crews improvise on site, which can cause damage, safety issues, delays and disputes about who should provide reinforcement or blocking.

Should contractors review drawings or leave that to the designer?

Both should review them, for different reasons. The designer checks the design intent, while the contractor checks buildability, access, services coordination and installation sequence. A contractor drawing review often finds clashes that are not visible in renders or concept sheets.

Can Palmiye review drawings prepared by someone else?

Yes. You can send plans, elevations or a room schedule and we will review them from a production and installation point of view. We then suggest clarifications or missing details before quoting and producing for projects in any country.

Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.

Get a quote for Bedrooms and Walk-in Closets

Share dimensions and quantities; we will prepare a quote for your project.