What Is a Door Mock-Up Sign-Off Sheet? Recording Decisions Before Mass Production
A door sample sign-off sheet is a one-page record of everything approved on a sample or mock-up door before production starts. This guide explains what to include and gives you a simple template that helps prevent disputes later.
A door sample sign-off sheet is a short, signed document that records exactly what the design team, owner and contractor approved on a sample door or mock-up room. It turns "we saw it and liked it" into a written reference that everyone, including the factory, can check against when the full order is produced. If you are ordering doors for a hotel, it is one of the cheapest risk controls available.
Below you will find what the sheet is for, which details belong on it, a simple template you can copy, and a few habits that keep the process clean on international projects.
Why a sign-off sheet matters
Most door disputes do not start with bad workmanship. They start with different memories of what was approved. One person remembers a satin lacquer, another a matt one; the sample had a 3 mm gap at the threshold, but nobody wrote down whether that was intended.
When a project spans several countries, time zones and decision makers, these gaps grow quickly. A sign-off sheet gives the factory a clear production release door instruction and gives the buyer a document to inspect the delivered goods against.
It also helps when people change. Project managers move on, procurement teams rotate, and the person who approved the sample may not be the person who receives the containers.
What a door approval form is, and what it is not
A door approval form is a record of decisions about a physical sample or a mock-up. It is not a contract, and it does not replace drawings or the door schedule. Think of it as the bridge between the two: the drawings say what should be made, the sample shows what was made, and the sheet states what was accepted.
It should also not be a long document. One or two pages that people actually read are far more useful than a ten-page form that is signed without being checked.
The core sections of a mock-up approval record
A practical mock-up approval record covers six areas. Keep each line short and factual.
1. Project and sample identification
- Project name, room or door type reference from the door schedule
- Sample number and date it was made
- Location where the sample was reviewed (factory, mock-up room, site, or by video)
- Names and roles of those present
2. Door leaf details
- Model name and drawing reference with revision number
- Leaf size and thickness in mm (with inches in brackets where needed)
- Core type and surface material
- Edge detail: square, bevelled, rebated or rounded
- Handing and swing direction shown on the sample
3. Finish
- Finish type: veneer with lacquer, paint, HPL, oil or other
- Colour reference, such as RAL, Pantone or a physical stain card
- Gloss level and surface texture
- Grain direction and veneer matching method, if timber veneer is used
4. Frame and hardware preparation
- Frame profile, rebate and wall thickness it suits
- Hinge type, quantity and positions
- Lock preparation, including electronic lock routing and cable paths
- Other cut-outs: peephole, door closer fixing, signage, kick plate
5. Performance and accessories
- Seals, drop bottoms or acoustic details, if specified
- Fire or acoustic test report references, where relevant to the model
- Undercut or floor clearance and the floor finish it was set for
6. Decision and conditions
- Status: approved, approved with comments, or rejected
- Listed comments, each with an owner and a deadline
- Whether a revised sample is needed
- Signatures, names, company and date
A simple template you can copy
The table below is deliberately basic. Add or remove rows to suit your project, but try to keep it on one page.
| Item | Approved specification | Comment or tolerance |
|---|---|---|
| Door model and drawing ref. | Model name, drawing number, revision | Note any change from the drawing |
| Leaf size and thickness | Width x height x thickness in mm | Measured on sample |
| Core and surface | Core type and facing material | Board supplier if specified |
| Finish and colour | Finish type, colour code, gloss level | Reference to retained sample or stain card |
| Edges | Edge profile and sealing | Corner radius if relevant |
| Frame and rebate | Profile and wall thickness | Fixing method |
| Hardware preparation | Hinges, lock, closer, cut-outs and positions | Heights measured from floor |
| Seals and undercut | Seal type and gap | Floor finish assumed |
| Photos attached | Front, back, edge, hardware, frame corner | File names listed |
| Decision | Approved / approved with comments / rejected | Open actions and dates |
At the bottom, add a line for each signatory: designer, owner or operator representative, contractor or procurement, and the factory. A short statement such as "Production may proceed as per this record and the referenced drawings" makes the release explicit.
Attach evidence, not just words
Words like "warm tone" or "slight sheen" mean different things to different people. Attach photographs taken in consistent light, with a scale reference such as a tape measure in the frame. Capture the full leaf, the edge, the hardware area and a close-up of the finish.
Where possible, keep a physical reference. A labelled, signed sample door or finish board held by both the factory and the buyer is the strongest comparison tool at delivery. Remember that colour looks different under different lighting, so note the lighting conditions under which approval was given.
Handling comments and conditional approvals
Conditional approvals are normal. The risk appears when comments are vague. Instead of "adjust colour slightly", write "stain to be one step lighter, new finish board to be sent for approval before production".
Mark clearly whether the order may proceed while a comment is resolved or whether production must wait. Many delays in door orders come from this single point: the factory waits for a decision that the buyer thought had already been given.
- Give every comment a number.
- Name who is responsible for each action.
- Agree what happens to the schedule if a second sample is needed.
- Close the comments in writing, then issue a final version of the sheet.
Version control and distribution
Use a clear file name that includes the project, door type, sample number and revision. Only the latest signed version should be used for production, and older versions should be marked superseded.
Send the signed sheet to everyone who touches the order: the design team, procurement, the site team and the factory. The receiving team at site should also know where to find it, because they will use it during the delivery inspection.
Making it work on international projects
When the factory and the project are in different countries, the sample is often reviewed remotely. Video reviews and photographs are useful, but they do not replace a physical sample for finish and colour. If the decision makers cannot attend in person, consider sending the sample by courier and recording the approval on the sheet once it has been seen.
Use metric dimensions first, add imperial values where your team needs them, and write dates in an unambiguous format such as 12 March 2025. Electronic signatures are generally fine for internal project records, but check the requirements of your own organisation.
Common mistakes to avoid
- Approving without drawings: the sheet should always reference a specific drawing revision.
- Leaving out hardware positions: lock and hinge heights are a frequent source of site rework.
- Signing before all parties have seen the sample: a missing opinion tends to come back later as a change request.
- Forgetting the floor finish: undercuts set for bare slab may not suit carpet or stone installed later.
- No retained reference: without a stored sample or finish board, delivery checks become a matter of opinion.
How the sheet supports delivery inspection
When doors arrive, the receiving team can compare a few leaves against the signed sheet and the retained sample. Dimensions, finish, edge detail and hardware preparation all have a written reference. If something differs, the discussion is based on a shared document rather than memory.
It also protects the buyer fairly. If a change was requested after sign-off, the sheet shows what was originally agreed, and both sides can discuss the impact on cost and schedule openly.
Next step
If you are preparing doors for a hotel project, send us your door schedule and drawings. We can propose a sample plan and share a sign-off sheet that fits your project, so approvals are recorded clearly before production is released.
Sıkça Sorulan Sorular
What is a door sample sign-off sheet?
It is a short signed record listing everything approved on a sample or mock-up door, including model, size, finish, edge details and hardware preparation. The factory uses it as the reference for production, and the buyer uses it to check delivered doors.
Who should sign a door approval form?
Typically the interior designer, the owner or operator representative, the contractor or procurement lead, and the factory. Anyone with authority over design, cost or installation should be included, so that no one raises a new requirement after production begins.
Can I approve a door sample by video or photos?
You can approve layout, proportions and many details remotely, but colour, gloss and texture are hard to judge on screen. For finishes, a physical sample or finish board is safer. Note on the sheet how the review was carried out.
What happens if I change something after sign-off?
Request the change in writing and reference the signed sheet. The factory can then explain the effect on cost and lead time, and a revised sheet is issued. Changes become harder once materials are cut or finished, so raise them early.
How long should a mock-up approval record be?